YOKOHAMA WHEEL
ADVAN Racing RS2 for Japanese Cars
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore Check required mm
10-spoke·1-piece
Calculate offset with this size →WheelFinder
Search registered wheels by diameter, width, PCD, stud count and offset.
20FX(Diesel) (4WD, 5MT) 1993/06–1994/10
Linked in this tool: PCD, Stud count
Calculate offset for this vehicle →Select country → manufacturer → model → model code/years → grade.
Vehicles without registered tyre and wheel data can also be selected.
Registered specifications and reference data matching the model code are linked. Check first-registration date, measured values and unregistered items against your own vehicle.
Choose PCD and stud count to match the vehicle. To see how diameter, width and offset change the wheel position, open a result in the offset calculator.
4,219 sizes found. Only registered products still on sale are included. Even with matching PCD and stud count, check caliper and fender clearance separately.
YOKOHAMA WHEEL
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore Check required mm
10-spoke·1-piece
Calculate offset with this size →YOKOHAMA WHEEL
17 × 8J / INSET 54
5 studs / PCD 114.3 / centre bore Check required mm
10-spoke·1-piece
Calculate offset with this size →YOKOHAMA WHEEL
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore Check required mm
10-spoke·1-piece
Calculate offset with this size →YOKOHAMA WHEEL
17 × 8J / INSET 37
5 studs / PCD 114.3 / centre bore Check required mm
10-spoke·1-piece
Calculate offset with this size →YOKOHAMA WHEEL
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore Check required mm
6-spoke·1-piece
Calculate offset with this size →YOKOHAMA WHEEL
17 × 8J / INSET 38
5 studs / PCD 114.3 / centre bore Check required mm
6-spoke·1-piece
Calculate offset with this size →YOKOHAMA WHEEL
17 × 8J / INSET 54
5 studs / PCD 114.3 / centre bore Check required mm
6-spoke·1-piece
Calculate offset with this size →WEDS
17 × 8J / INSET 49
5 studs / PCD 114.3 / centre bore 73 mm
Spoke
Calculate offset with this size →WEDS
17 × 8J / INSET 32
5 studs / PCD 114.3 / centre bore 73 mm
Spoke
Calculate offset with this size →WEDS
17 × 8J / INSET 42
5 studs / PCD 114.3 / centre bore 73 mm
Spoke
Calculate offset with this size →WEDS
17 × 8J / INSET 38
5 studs / PCD 114.3 / centre bore 73 mm
Spoke
Calculate offset with this size →SSR
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore Check required mm
Spoke
Calculate offset with this size →SSR
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore 22 mm
10-spoke
Calculate offset with this size →SSR
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore Check required mm
Spoke·2-piece
Calculate offset with this size →WORK
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore 73.3 mm
5-spoke·1-piece
Calculate offset with this size →TWS
17 × 8J / INSET 35
5 studs / PCD 114.3 / centre bore 73 mm
10-spoke
Calculate offset with this size →TWS
17 × 8J / INSET 42
5 studs / PCD 114.3 / centre bore 73 mm
10-spoke
Calculate offset with this size →TWS
17 × 8J / INSET 48
5 studs / PCD 114.3 / centre bore Check required mm
Spoke·1-piece
Calculate offset with this size →WATANABE
17 × 8J / INSET 30
5 studs / PCD 114.3 / centre bore Check required mm
Spoke
Calculate offset with this size →WATANABE
17 × 8J / INSET 40
5 studs / PCD 114.3 / centre bore Check required mm
Spoke
Calculate offset with this size →5ZIGEN
17 × 8J / INSET 37
5 studs / PCD 114.3 / centre bore Check required mm
Spoke·1-piece
Calculate offset with this size →5ZIGEN
17 × 8J / INSET 47
5 studs / PCD 114.3 / centre bore Check required mm
Spoke·1-piece
Calculate offset with this size →5ZIGEN
17 × 8J / INSET 35
5 studs / PCD 114.3 / centre bore 73.1 mm
Spoke·1-piece
Calculate offset with this size →5ZIGEN
17 × 8J / INSET 45
5 studs / PCD 114.3 / centre bore 73.1 mm
Spoke·1-piece
Calculate offset with this size →Even with the same dimensions, disc profile and brake clearance differ. Check the product's fitment chart, together with forged/cast and one-piece/multi-piece differences.
Wheel basics →View original sizes and grades for the Mazda Cronos GEFP →